📢 New: get today's jobs on our WhatsApp Channel
Jobiglo

No results.

Senior Electrical Engineer - Data Centre Construction

Vallum Associates · Helsinki

New
Senior 🇬🇧 English
HV/MV/LV systems UPS Switchgear BIM CAD IEC/EN standards QA/QC Commissioning

Job description

About the role

A major hyperscale data centre construction project in Finland is looking for an experienced Senior Electrical Engineer. Working closely with Electrical Package Managers, the engineer provides technical support across electrical design coordination, procurement, installation, testing, commissioning and final handover. The role is full-time and onsite.

Key responsibilities

  • Support Electrical Package Managers with daily site activities, construction planning, installation sequencing and technical coordination.
  • Oversee the technical delivery of HV/MV/LV distribution, transformers, switchgear, generators, UPS, batteries, busbars and earthing systems.
  • Review electrical drawings, specifications, technical submittals, calculations and equipment schedules for compliance and constructability.
  • Coordinate electrical subcontractors, supervisors, vendors and BIM teams, resolving technical queries, RFIs and installation challenges.
  • Work with CSA, Mechanical, ICT/ELV, BMS and Commissioning teams on multidisciplinary interfaces.
  • Monitor installation progress, materials, quality standards and programme milestones.
  • Ensure compliance with HSE requirements, Finnish regulations, IEC/EN standards and project QA/QC procedures.
  • Support electrical testing, FAT/SAT, energisation, Integrated Systems Testing (IST) and final handover documentation.

Required profile

  • Degree in Electrical Engineering or a relevant technical/trade qualification with substantial engineering experience.
  • Minimum 8 years of electrical engineering experience on major construction projects, including significant site-based delivery.
  • Experience supporting Electrical Package Managers or leading electrical installation workstreams.
  • Fluent English.
  • Desirable: previous experience delivering data centres, mission-critical facilities or advanced-technology construction projects, and experience with complex energisation, IST and operational handover.

Required skills

  • Strong technical knowledge of HV/MV/LV systems, UPS, generators, transformers, switchgear and electrical infrastructure.
  • Ability to review technical drawings, calculations, BIM/CAD information and electrical design documentation.
  • Understanding of procurement, QA/QC, commissioning and construction programme requirements.
  • Excellent communication, coordination and problem-solving skills.

Questions fréquentes

Le salaire n'est pas communiqué publiquement par le recruteur. Vous pouvez postuler et négocier directement avec Vallum Associates.
Cliquez sur "Postuler maintenant" en haut de la page. Vous pouvez importer votre CV en 1 clic — Jobiglo extrait automatiquement vos informations et postule pour vous.

Why are you reporting this job?

Thank you for your report. We will review this job.

Apply in 30 seconds

Enter your email to apply. An account will be created automatically.

Apply now →

By continuing, you accept our terms of use.

Already have an account? Login

Une question sur cette offre ?

Posez-la ici : vous recevrez le récapitulatif de l'offre par e-mail, tout de suite.

Published 1 päivä sitten

Expires 1 kuukauden päästä

15 views · 0 interested

Boost your chances

Upload your CV — we will match you with relevant openings.

Analyzing your CV...

Vallum Associates

Helsinki